Push the end of the pipe and
fittings simultaneously, Without
turning them upto the marked
welding depth into the tools
(Photo-2).. It is important to
observe the heating times of the assembly parts.
After the specific heating time, quickly remove pipe &
fitting from the welding dies. Join them immediately and
without turning, until the marked welding depth of pipe is covered by the PP-R fitting.
|